Projects
Capital Park, Pretoria
- Location: Capital Park, Pretoria
- Project Date: 2017-2017
- Total Cost: R60 Million
- Services Rendered: Structural, Civil, Mechanical, Electrical and Architectural services
- Description: Refurbishment of Mechanical Warehouses and Engineering School for CRRC and Transnet JV.
Eerste River Developments
- Location: Eerste River, Cape Town
- Project Date: 2017
- Total Cost: R56 Million
- Services Rendered: Civil& Electrical Engineering Services
- Description: Two privately owned land situated in Eerste River, developer appointed ACE Consulting as the turnkey civil designer and contractor for a total of 100 GAP houses. The development commences on the 01 February 2017.
Khayelitsha clinic
- Location: Khayelitsha, Cape Town
- Project Date:2010
- Total Cost: R2 million
- Services Rendered: Civil &Structural Engineering Services
- Description: The Mayenzeke Clinic required expansions to make provision for an integrated TB model and HIV care, including anti-retroviral therapy. The City of Health Department funding internal charges to improve patient flow and increase allocated space for staff, administration, storage and a pharmacy.
Construction Of Visitor Information Centre In Mamre
- Location: Mamre, Western Cape
- Project Date: 2007-2010
- Total Cost: R2 Million
- Services Rendered: Civil & Structural Engineering Services
- Description: The objective of the project was to increase locally skilled labour and use locally produced materials. The primary focus was skills enhancement and transfer of skills to local labour especially locals who have an exceptional reputation engagement in this Heritage Revitalization Initiative. The project was constructed using conventional building materials, concrete, steel, brick work and timber.
Uwc Main Entrance Upgrade
- Location: University of the Western Cape, Bellville
- Project Date: 2016-2017
- Total Cost: R1.5 Million
- Services Rendered: Structural and Civil Engineering Services
- Description: The re-alignment of road and upgrade of the main entrance and security kiosk will be the first of a range of upgrades
St Vicent Clinic
- Location: sea winds, cape town
- Project date:2012
- Total cost:r8.5 million
- Services rendered: mechanical &electrical engineering services
- Description:the coct required a mechanical and electrical engineer to attend to full services of engineering to manage from inception to handover. The new infrastructure needed to accommodate good airflow through natural ventilation of mechanical ventilation for air pressure changes.The relocation of the current tb facilities and design of new waiting rooms for adult patients were required. The new facilities consist of consulting, dst rooms, toilets for tb patients, waiting area and store room. It also increased the receptions/records rooms and created a separate area for paediatrics and adults.
Sea Point Pavilion Swimming Pools
- Location: Sea Point, Cape Town
- Project Date:2013
- Total Cost:R3 Million
- Services Rendered: Structural Engineering Services
- Description: Structural engineering services rendered for the inspection and detailing of the current rim flows, expansion joints and re-epoxying of the pools, investigating the current pool design and commenting on the existing rim flows & expansion joints and cracks around the stainless steel balustrades.
Parow North Public Swimming Pool
- Location: Parow North, Cape Town
- Project Date:2010
- Total Cost: R2.8 Million
- Services Rendered: Architectural Design Services
- Description: The Parow North Swimming Pool facility required an upgrade of the swimming pool and the administration building. The architectural design allows universal access for public disposal. Through the investigation of the filtration system and CSIR clean healthy water was provided to the public.
Observatory Community & Recreational Facility
- Location: Observatory, Cape Town
- Project Date: 2010
- Total Cost: R3.5 Million
- Services Rendered: Structural Engineering Services
- Description: Observatory Community and Recreational Facility required space planning for recreational activities as well as other social development activities. Assessments were conducted to provide suitable solutions to meet all administrative special requirements. The facility was approximately 120 years old before the restoration of this project therefore close management with heritage consultants were required to ensure the facility kept the look and feel of the 18th century.
Langa Clinic
- Location: Langa, Cape Town
- Project Date: 2012
- Total Cost: R2.2 Million
- Services Rendered:Â Structural Engineering Services
- Description: The appointment of structural engineering services for toilet repairs and renovations at Langa Clinic
Heideveld Community Health Centre
- Location: Heideveld, Cape Town
- Project Date: 2013
- Total Cost: R40 Million
- Services Rendered: Structural and Civil Engineering Services
- Description: The new Klipfontein Emergency Centre Hub at the Heideveld Community Health Care Centre was designed to ensure continuing of emergency core services during the recasting and redevelopment of GF Jooste Hospital.  The Emergency Clinic provided space to accommodate 30 observation beds, 12 treatment bays, 4 spaces in rehabilitation area of which are for paediatric service. The new facility is 2300m².
Blue Water Chalets
- Location: Mitchells Plain, Cape Town
- Project Date: 2012
- Total Cost: R12 Million
- Services Rendered: Project Management, Civil and Structural Engineering Services
- Description: Blue Waters Resort is situated off Lukannon Drive and perpendicular to Baden Powell Drive which forms part of the Blue Waters Node.Ace Consulting was appointed to provide the civil and structural engineering design for the project as project management services from inception to completion of the project
Bellville Library
- Location: Bellville, Cape Town
- Project Date: 2009
- Total Cost: R2 Million
- Description: The works entails the removal of existing chilled water piping in order to create room to remove the two air cooled chillers from the roof building. All removing was in accordance with the Montreal and Kyoto Protocols. Also required was the supply and installation of two new Air Cooled Chillers.
Vaalfontein Solid Depot
- Location: Â Vaalfontein, Helderberg
- Project Date: 2013
- Total Cost: R3 Million
- Services Rendered: Structural, Electrical, Architectural & Quantity Surveyor Services
- Description: Vaalfontein Solid Waste Management is one of the oldest Depots situated in Old Main Road, Firgrove, Helderberg. The Depot compromises of a main building and a steel structure portal frame cladded with absorb sheets. During the upgrades the existing portal frame was demolished and replaced with boardrooms, 2 store rooms, a wash bay for the refuse trucks and a wash bay for the bins. The male and female ablutions in the main building was structured and revamped which included a disabled toilet, provided better and bigger mess rooms and locker rooms. The project was successfully completed 3 weeks ahead of schedule.